Live Projects - FCM Holdings
basement conversions, basements, london, london basements, fcm, extensions, groundworks, fcm holdings
248
page-template,page-template-full_width,page-template-full_width-php,page,page-id-248,ajax_fade,page_not_loaded,,qode-title-hidden,footer_responsive_adv,transparent_content,qode-child-theme-ver-1.0.0,qode-theme-ver-10.1.1,wpb-js-composer js-comp-ver-7.2,vc_responsive

Live Projects

Garratt Lane

Wandsworth

 

Description
Demolition of existing builder and timber merchant building and redevelopment with a part 2, part 3 storey building plus basement level comprising 17 apartments and associated landscaping, car and cycle parking.

 

Location
1023 Garratt Lane
Tooting
London, SW17 0LN

 

Project timeline
100 weeks

Somerset Road 

 

 

Description

To Convert 16 Somerset Road from 2no. flats into 9-no self contained units including single storey, part 2-
storey and part 3-storey (side/rear/side wraparound) extension; creation of roof balconies and terraces to rear
elevation; rear roof extension including increase of ridge height, alterations to fenestration; installation of front
boundary wall; and provision of associated amenity space, car parking, refuse and cycle storage. 2. Convert
18 Somerset Road from 6no. flats into 9-no self contained units including single storey, part 2-storey and part
3-storey (side/rear/side wraparound) extension; creation of roof balconies and terraces to rear elevation; rear
roof extension including increase of ridge height, alterations to fenestration; installation of front boundary wall;
and provision of associated amenity space, car parking, refuse and cycle storage.

 

Location

 

Project timeline
XXXXX

Douro

London

 

Description
XXXXXX

 

Location
XXXXX

 

Project timeline
XXXXX

Shenley Road

London, SE5

 

Description
Construction of a 3 storey plus basement property comprising of 1, one bedroom flat and 1, two bedroom flat with rear terrace.

 

Location
14 Shenley Road
Tooting
London, SE5 8NN

 

Project timeline
40 weeks

Avenues

XXXX

 

Description
XXXX

 

Location
XXXX

 

Project timeline
XXX

Future Projects

Kingfisher House

Chelmsford

Description

Existing building to be stripped out and new high end apartments configured into existing building with new second floor and roof with apartments.

 

Due to Start

January 2024.